Top of Page
Menu
Search the Site
Trolley

Woodland Avenue Closed for Trolley Line Improvements

February 24, 2022

As part of a scheduled track replacement project, SEPTA will close Woodland Avenue between 58th Street and 60th Street in Southwest Philadelphia beginning at 7am Monday, February 28 through April 15, 2022.

During the 24/7 closure, vehicular traffic will be restricted in the work areas and motorists will be directed to use 58th Street, Kingsessing Avenue and 60th Street. All side streets in the affected construction areas will be closed to thru traffic. Local access will be maintained up to the construction zone. 

Vehicular parking will not be permitted in the construction zone or adjacent to the tracks being reconstructed, however pedestrian access will be arranged to businesses open during construction. Businesses on both sides of the street are OPEN. 

Emergency vehicles and trash collection, along with city utilities will continue to have access.

Bus Route G will be detoured and the Route 11 Trolley will be converted to bus between Darby Transportation Center and the 40th Street Portal. Check System Status for details.

Normal construction hours are Monday through Friday, 7am to 3:30pm with occasional weekend work as needed.

This operation is weather dependent.